|
Today was the first weekend that I really have something BRAT wise to show for my time. I have been doing everything from installing a turbo for a friend to spending the 4th in D.C. The project for this weekend was to complete the rear driveline. This involves the prep of the rear diff, rebuilding of the half shafts and driveshaft cleanup. The diff rebuild and half shaft rebuild will make it to my BRAT fixes page soon. The diff after a days work 1 2
And the halfshaft work, the CV joints in pieces 1
|